Know what you owe the regulator, before they ask.
Country-specific grid-code, reporting, metering, and inspection obligations wired into the platform. Onboard a plant with the right country; every report it generates ships with the applicable obligations baked in.
Three EU regulations that now shape every plant's data stack
Country grid codes are table-stakes. The stuff that's actually moving CFO and lender budget right now is CSRD, the EU AI Act, and the EU Battery Regulation. NuraVolt ships these built-in.
CSRD E1 reporting
Every plant has ESRS E1-5 (energy) and E1-6 (GHG) obligations. NuraVolt auto-generates the plant-level data pack from your existing generation + availability telemetry.
AI Act model cards
Forecasting, dispatch, and fault-detection models touching "critical infrastructure management" (Annex III) ship with auto-generated model cards covering intended use, accuracy metrics, oversight points, and limitations.
EU Battery Passport feed
From Feb 2027 every BESS ≥ 2 kWh needs a digital passport with performance, degradation, and SoH history. NuraVolt already captures this, we package and submit it.
8 country packs. More on request.
Each pack maps a plant's asset type + capacity to the obligations that actually apply. No paging through PDFs.
What's inside each pack
Six layers, normalised across every country so the reporting engine can speak a single language.
Grid-code envelope
LVRT/HVRT ride-through curves, frequency band, reactive-power range, ramp-rate limits, anti-islanding standard. Bound to the plant on onboarding.
Reporting obligations
Every periodic report you owe the regulator and grid operator, monthly, quarterly, annual, with deadline, recipient, and source clause.
Metering & data retention
Meter class, sampling interval, retention window, calibration cadence. Drives data-ingest validation and archive policies.
Inspection cadence
Mandatory periodic inspections (OCA, O&M audit, certification renewal) with the authority responsible and the minimum interval.
Source citations
Every rule links back to the authoritative text, royal decree article, grid-code section, regulator circular.
Environmental reporting
Guarantees of origin, green certificates, and emissions-avoided declarations wired to the right registry.
Bound to your plant automatically
Pick a country on onboarding. That's it.
Pick country on onboarding
Plant wizard asks for country + capacity + asset type. The pack binds automatically.
Obligations resolve
We filter the pack by your plant, a 200 MW solar farm in Spain sees CECRE telemetry rules; a 50 kW rooftop does not.
Reports include them
Every scheduled report can include an obligations section: what you owe, when, to whom, with source citations.
What you stop losing sleep over
Compliance doesn't have to be a PDF graveyard.
See the obligations module running against a sample plant in the live demo.